Overview
This gadget indicates how long issues stayed in each workflow status, status category, or board column. You can choose to show total time or average time, or group the data by different criteria, such as assignee, project, or priority. The displayed result can be in the form of pie chart, bar chart or line chart as per your choice.
The gadget can display a Data tab with detailed information about each issue and the time in the statuses they reached during their life-cycle, which you can easily export in CSV format.
This gadget is especially useful for identifying workflow bottlenecks, understanding team performance, and ensuring projects stay on schedule.
Configuration
The settings of this gadget are divided in 2 tabs:
Data tab - contains the required settings of the gadget, such as title or data source
More Settings tab - contains the optional settings
Data tab
On this tab you can configure the required settings of the gadget.
Setting | Description |
---|---|
Gadget title | Choose what to display in the title bar of the gadget. |
Data source | Select the type of Data Source used by the gadget:
|
Count also the sub-tasks and their estimate | Check this option if you want the gadget to consider the sub-tasks from the selected board, filter or the specified JQL. |
What to measure | Choose what you want the gadget to measure. You can chose between:
|
Calculation method | Indicates how calculate the time. You can choose between:
|